0 obrazy
Facility: the production and assembly of the equipment to the facility "КОС-ЗOO" "Construction of sewage treatment facilities with capacity of 300,000 m3 per day" in Turkmenistan, Ashkhabad.
Equipment: FAAS Trading Co has implemented a comprehensive supply of equipment including:
• 10 kV distribution point - 29 cells;
• reactive power compensation-10kV-900kVAr - 2 pcs.;
• soft start system of six blowers equipped with asynchronous motors AM1 450L2A BSS of 1000 kW capacity, based on two devices;
• 10 kV gas-insulated monoblocks – 13 pcs.;
• 0.4 kV switchgears - 15 sections;
• three-phase dry power transformers with the capacity of 160kVA up to 2500kVA with the voltage of 10/0,4 kV with the Trihal cast isolation in a metal sheath (IP31) windings connection group "triangle-star-11" with the neutral available with the forced ventilation - 15 pcs.;
• busbar system from 1600A to 4000A - 7 pcs.
Some information about the facility:
The total area of the building site is 75 ha. Purification workflow is provided by the following buildings and structures placed on the site:
• main sewage pumping station
• receiving chamber
• building of lattices (2 pieces)
• sand traps (8 pipelines)
• activated sludge unit (16 pieces)
• secondary settling tanks (16 pieces)
• pump station of the secondary settling tanks discharging (4 pieces)
• sludge pump station (2 pieces)
• blowing house (1 building)
• sludge thickeners (3 pieces)
• aerobic stabilizers (4 piece)
• effluents decontamination unit (1 pieces)
• sludge drying beds (16 pieces)
• sand bunkers building (2 pieces)
• water supply unit (1 pc).
Besides these technological facilities the administration block, garage for 10 cars, wheels wash and car repairs trestle are located on-site.